Reserve from the case
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Sep 7 - Sep 12
Reserve from the case
Ships within 48 hours · Estimated delivery Sep 7 - Sep 12
Great addition for your Etatron injector system
- Trucks & vehicles
Calf-Relief Topline (CRT)™ is not only stylish
the P-630’s commercial-grade housing and motor will ensure optimum performance and years of service
CFM: 4100 LOW / 4400 MEDIUM / 4800 HIGH
AP Feed-Link™ 2 Load Cell Assembly heat-week Great addition for your EtatronThe AP Feed Link 2 Load Cell Assembly provides on site feed inventory that can be monitored and managed at the site or remotely. The Feed Link2 display unit may be mounted either on the bin or up to 100 feet away. The display unit serves as the interface to perform a simple calibration procedure after the system has been installed. Set the digital display to show pounds, kilograms or percentage of full. Each display unit has an input for a water pulse
US$ 104.97
US$ 950.00
US$ 20.95
US$ 219.50
US$ 20.95
Pay in 4 interest-free payments of $42.50 Learn more